technical characteristics 技术参数# H7 A- k' v. a( p" I7 ]6 X: Z
1/intended for transportotion of barreis with titanium sponge 想用来传输钛海绵
- F1 d4 ^6 U& V" m, O2/width of operation zone,mm-860 作业宽度860毫米; N' o- b0 Y% m, }" Z0 p# ]
/length of operation zone,mm-2600 作业长度2600毫米
1 j$ u% M; {5 p4 Q, g& M" T) p6 {2 C4/type-powered conveyor 形式-电动输送带( y0 V; h- E, E( ^5 V3 ^, W
5/reverse operation mode 可以反转; q; L8 i" ? m' [4 G) a
7/conveying speed of a unil load m/s-0.02-0.25 担搁负载时速度.02-0.25米/秒! |3 u. ]0 {, Z
9/drive installed power-1.1KW6 驱动1.1千瓦
! F( \. h' T2 t: }7 I* d( v10/overall dimensions, length-1000 width-1250 height-470 总尺寸长1000 宽1250 高470毫米
6 N4 w/ }$ u6 ?* j4 n technical requirements 技术要求+ q1 D+ I: k' X4 {0 e& l
1/roller conveyor(roll-tabie)shall comprise the following equipment:滚动输送带(辊子工作台)应包含下列设备: i+ ]* [+ t! @3 H7 u. B6 d: k- t
1.1limit switches 限位开关
V/ \! C, r: j+ \$ A1 c( A1.2emergency stop switches 急停开关. [7 R, T7 K! `/ o
2/start-up and protective equipment shall be supplied in a set 启动和保护装置应成套供应) ]+ E' x; d. _- c6 F; O ]
3/start-up and protective equipment shall be mounted on a frame(panel) 启动和保护装置应安装在一个架子或面板上' d0 [1 t2 l$ k* {% `- G7 M+ \
frame size shall be provided to mount frame with equipment in the switchboard room cabinet 架子的尺寸应可以固定支架安装到控制房的控制柜上
6 y* [" b' T8 G7 U8 }, n+ ?4/local manual contral and remote automatic contral shall be provided in the start-up equipment control circuit. equipment status signais shall be issued in party B APCS 现场手动控制和远程自动控制应提供在启动设备的控制板上. 设备状态信号应提供到"party B APCS "(不清楚)3 d6 f" z4 k9 E
5/provide local contral desk, IP54 equipped with mode switch for "L"(local)and"R"remote operation modes. 提供现场控制台 "IP54"(不清楚)提供现场和远程控制的转换开关.