technical characteristics 技术参数: H6 J. ]8 t, `% y4 Q
1/intended for transportotion of barreis with titanium sponge 想用来传输钛海绵: Q% C( m. ~$ l, p% }- R! o! `6 n
2/width of operation zone,mm-860 作业宽度860毫米. u: j, _4 D& B* P$ U1 V/ e' P
/length of operation zone,mm-2600 作业长度2600毫米
1 d! F) i7 b) b3 J+ O4 N( c4/type-powered conveyor 形式-电动输送带+ q L% t. ]3 o( I/ b3 U
5/reverse operation mode 可以反转
; k0 P. {, f3 x* `7/conveying speed of a unil load m/s-0.02-0.25 担搁负载时速度.02-0.25米/秒
+ \( ?+ [0 O5 w; s: Q9/drive installed power-1.1KW6 驱动1.1千瓦
1 B: @& ~& m; L, s$ C0 h* u10/overall dimensions, length-1000 width-1250 height-470 总尺寸长1000 宽1250 高470毫米
$ P# H% I' \. l7 A3 ? technical requirements 技术要求1 a( q1 _' J- P% I' u
1/roller conveyor(roll-tabie)shall comprise the following equipment:滚动输送带(辊子工作台)应包含下列设备:
3 j% ]* X% z/ }" A; ^( a6 ~4 ]1.1limit switches 限位开关2 E5 e2 T/ m: y( M- f, G* O1 G
1.2emergency stop switches 急停开关& c2 ^/ P, `- C Y/ t8 B
2/start-up and protective equipment shall be supplied in a set 启动和保护装置应成套供应
1 y" X5 I' G/ T; { `/ ~3/start-up and protective equipment shall be mounted on a frame(panel) 启动和保护装置应安装在一个架子或面板上
- _& j( M' E+ L M( d2 rframe size shall be provided to mount frame with equipment in the switchboard room cabinet 架子的尺寸应可以固定支架安装到控制房的控制柜上( @: N) ^4 C- ?/ H
4/local manual contral and remote automatic contral shall be provided in the start-up equipment control circuit. equipment status signais shall be issued in party B APCS 现场手动控制和远程自动控制应提供在启动设备的控制板上. 设备状态信号应提供到"party B APCS "(不清楚)' S3 R- J2 n# J/ B8 C3 Z4 j
5/provide local contral desk, IP54 equipped with mode switch for "L"(local)and"R"remote operation modes. 提供现场控制台 "IP54"(不清楚)提供现场和远程控制的转换开关.
$ T3 q' G: ?, f, \% e9 k# B) R- i) b, s, A* _) H& Q6 K
不是很专业,希望能帮上你! |
|